This report presents the engineering, economic and environmental studies conducted to determine the advisability of modifying the existing project in compliance with four Congressional Resolutions. Various solutions to the problems and needs of the Port of Georgetown were analyzed. Based on the results of this analysis, the District Engineer finds that there is no economically-feasible plan for modifying the existing Federal navigation project. The District Engineer, therefore, recommends no plan of improvement as a result of this report.