SFGTV: San Francisco Government Television
31
31
Aug 31, 2014
08/14
by
SFGTV
tv
eye 31
favorite 0
quote 0
. >> yeah, and we actually have to your earlier comment, and i think that i mentioned, working with sfmta staff and so we have a meeting set up with that we are scheduling now in september and we are scheduling a meeting with them in september to talk about that. and that is the one that your consultant did not use and i mentioned it a couple of times and and it was the (inaudible) on the sand and (inaudible) not a bay, or an ocean, but it seems to be very effective there. and i mean, that i, some of us, much prefer them taking a taxi. >> yeah. >> not exactly of the most pleasant of attitudes sometimes. >> thank you, very much. for a great report. >> and i am really happy to hear that the current operators are having success and i think that it is wonderful that we are looking at expanding because it is very much needed and i think that the consultants did a great job and so i really look forward to working with the commission and the staff, in increasing quickly, the new stops, along the water front, because i think that this can be a great service. so thank you. >> thank you, it is very
. >> yeah, and we actually have to your earlier comment, and i think that i mentioned, working with sfmta staff and so we have a meeting set up with that we are scheduling now in september and we are scheduling a meeting with them in september to talk about that. and that is the one that your consultant did not use and i mentioned it a couple of times and and it was the (inaudible) on the sand and (inaudible) not a bay, or an ocean, but it seems to be very effective there. and i mean,...
SFGTV: San Francisco Government Television
13
13
Aug 31, 2014
08/14
by
SFGTV
tv
eye 13
favorite 0
quote 0
framework and the water front transportation assessment, effort that is being led by peter, and others at sfmta. and with that, i am done and i would be happy to take your comments and questions. >> thank you. >> we could have the public comment, and maybe this is the time for the operators to come to speak. >> hello. i am dave thomas and owner of san francisco water taxi and i would like to say thank you. for letting us win that contract, we have never had a quicker way to spend money more creatively than after we got that, and our rider ship goes up every month, we have been running steadily since march and we had some shake down issues to get a new boat on-line and right now we currently have two different boats and two different boat yards and we have learned one thing and we don't want to be promised anything and we hope that late september and at least one of thefm will be on-line, by november, and by, after a rocky start, i think that the port staff has done an amazing job come ng and helping us tweak the traffic signs on the seat which has given us an increase in the customers coming of
framework and the water front transportation assessment, effort that is being led by peter, and others at sfmta. and with that, i am done and i would be happy to take your comments and questions. >> thank you. >> we could have the public comment, and maybe this is the time for the operators to come to speak. >> hello. i am dave thomas and owner of san francisco water taxi and i would like to say thank you. for letting us win that contract, we have never had a quicker way to...
SFGTV: San Francisco Government Television
27
27
Aug 31, 2014
08/14
by
SFGTV
tv
eye 27
favorite 0
quote 0
cup and then further the assessment that the sfmta is now carrying out today. and so, we realize that there is always, still new opportunities for how we can, and improve the transportation needs and respond to the needs that the people have for today, but it is important for the public to understand that there has been a tracking of this issue for many years. and a few weeks ago, we were here before you to brief you on the enhancement project and that is the latest, initiative that we were working on with sfmta to bring forth safer and better bike access along the embark der row. and with that, i think that i will turn it over to brad, and he will give you a overview on the development project, and the capitol improvements. >> thank you, diane. >> and thank you commissioners. brad benson, and director of special projects. this is been, you know, an amazing effort of the port staff to put together this report, across all of the ports divisions. and i just want to say that what a pleasure it has been for me and i worked with bar, and buy ron and all of the port
cup and then further the assessment that the sfmta is now carrying out today. and so, we realize that there is always, still new opportunities for how we can, and improve the transportation needs and respond to the needs that the people have for today, but it is important for the public to understand that there has been a tracking of this issue for many years. and a few weeks ago, we were here before you to brief you on the enhancement project and that is the latest, initiative that we were...
SFGTV: San Francisco Government Television
29
29
Aug 30, 2014
08/14
by
SFGTV
tv
eye 29
favorite 0
quote 0
said an overgrown people through trash there we decided to put it a public space we've worked with the sfmta to get bulb out and crosswalks and a huge amount of pedestrian traffic and directly north of mr. michelle's establishment is the northeast medical center that serves thousands of low income people to get health care and across the street is the family connections which again serves hundreds if not thousands of families in the neighborhood. this street has two busy business lines that go back and forth people are not just stroerl not paying attention they're busy trying to get somewhere. where this box would be that would restrict the pedestrian traffic and stroerts and which were in tow the different people trying to get to a bus stop and the elderly population that's huge in our neighborhood. plus we think that the mitchel's have been helpful in expanding our straightaway streetscape this area where they put their chairs out it is only outdoor seating space that any of the businesses in the neighborhood have provided. the neighborhood association has worked hard to get >> number of g
said an overgrown people through trash there we decided to put it a public space we've worked with the sfmta to get bulb out and crosswalks and a huge amount of pedestrian traffic and directly north of mr. michelle's establishment is the northeast medical center that serves thousands of low income people to get health care and across the street is the family connections which again serves hundreds if not thousands of families in the neighborhood. this street has two busy business lines that go...
SFGTV: San Francisco Government Television
14
14
Aug 30, 2014
08/14
by
SFGTV
tv
eye 14
favorite 0
quote 0
. >> and, the sfmta has five open recommendations from cfa's audit of this sustain able street division and two recommendations asked mta to develop, the standard job description and compensation divisions for management parking facilities, reports being in the process of finalizing the job description can the non-profits that manage the parking facility and the other three recommendations asked mta to develop the traffic sign inspections and procedures, and maintain the asset listing of the traffic signs and mta reports that it has implemented a new enterprise, asset management system which is customizing each unit in the department and anticipates rolling out this system to the units responsibility for the traffic signs by the end of 2015. and we were quite aware that the system is being implemented and it is taking some time to procure. and again, once they have implemented the system in a year out we will go back and do auditing and so it is on the audit plan to go back to this particular project. >> okay. >> and of the 152 recommendations cfa made to the sfpuc in the physical year,
. >> and, the sfmta has five open recommendations from cfa's audit of this sustain able street division and two recommendations asked mta to develop, the standard job description and compensation divisions for management parking facilities, reports being in the process of finalizing the job description can the non-profits that manage the parking facility and the other three recommendations asked mta to develop the traffic sign inspections and procedures, and maintain the asset listing of...
SFGTV: San Francisco Government Television
15
15
Aug 29, 2014
08/14
by
SFGTV
tv
eye 15
favorite 0
quote 0
elementary school safe roots to the system we were able to feature this in the local papers thank you sfmta for delivering this it project will includes a speed curb on and russian island a large round about. we were trying to draw altercation to those projects to comfort on the clarifying delivery and design to insure they continue to move forward this fall we expect to see chinatown and other promotions move forward. for more information on those types of project please vital sf and contact courtney at the transportation authority. the project for the nsb r project we thank the arts and civic design domino for their approval of the brt designs they have jurisdiction over the urban design and expressed their appreciation to coordinate across the departments. so thank you for that and pleased to see that move forward >> now with the completion of that milestone we're going to position quarterly on the reports. you have the geary project this continues with the circulation of our administrative draft and we're prepping to circulate that to the mta and to the public in the october formulate a
elementary school safe roots to the system we were able to feature this in the local papers thank you sfmta for delivering this it project will includes a speed curb on and russian island a large round about. we were trying to draw altercation to those projects to comfort on the clarifying delivery and design to insure they continue to move forward this fall we expect to see chinatown and other promotions move forward. for more information on those types of project please vital sf and contact...
SFGTV: San Francisco Government Television
8
8.0
Aug 28, 2014
08/14
by
SFGTV
tv
eye 8
favorite 0
quote 0
do we have anyone from sfmta to speak on this item? >> good morning. i'm louis [speaker not understood], senior light rail engineer for muni. thank you, supervisor mar and chair farrell for allowing us to present this project to overhaul 16 of the muni historic [speaker not understood] streetcars. [speaker not understood] and they've been in regular service since then. just due to normal wear and tear, they need to be overhauled again. this overhaul will be a ground up restoration so the cars will be essentially new when they come back and we expect to get another 20 years out of them. we're only going to be taking four cars out of service at a time, so, service won't be affected during the project. the contract is with brookville equipment, contract value is $34.4 million. and if you have any questions, we'd be glad to answer them. >> okay, thank you. colleagues, no questions? mr. row, can we go to your report, please? >> yes, mr. chairman, supervisor mar. on page 4 of our report, a budget for the proposed project costs will be 34.5 million as shown i
do we have anyone from sfmta to speak on this item? >> good morning. i'm louis [speaker not understood], senior light rail engineer for muni. thank you, supervisor mar and chair farrell for allowing us to present this project to overhaul 16 of the muni historic [speaker not understood] streetcars. [speaker not understood] and they've been in regular service since then. just due to normal wear and tear, they need to be overhauled again. this overhaul will be a ground up restoration so the...
SFGTV: San Francisco Government Television
19
19
Aug 26, 2014
08/14
by
SFGTV
tv
eye 19
favorite 0
quote 0
so a little bit about the schedule the environmental document was approved by the sfmta and even though lead of the project contributed to the sfmta and peter has been leading the effort and mta implemented the design so it's underway a new project cac was formed and they've met on june 26th a new group of people some people from the environmental cac were there the final design takes us stilettos sum and construction beginning in early 2016 with revenue options in the mid of 2018. with the completion of thirty percent design in the conceptual engineering report there was a new cost estimate to increase to $162 million it's completely fund through the recreational and was the federal small start fund. the c e r identified a few challenges with the project technical and otherwise they've found first they're focused on the station design so one of the goals of the projects is to achieve the level boarding where the doors line up with the platform and there's issues with the vehicle prosecute curd the lug nuts stick out they'll scratch a platform and in addition trying to achieve vertical
so a little bit about the schedule the environmental document was approved by the sfmta and even though lead of the project contributed to the sfmta and peter has been leading the effort and mta implemented the design so it's underway a new project cac was formed and they've met on june 26th a new group of people some people from the environmental cac were there the final design takes us stilettos sum and construction beginning in early 2016 with revenue options in the mid of 2018. with the...
SFGTV: San Francisco Government Television
44
44
Aug 26, 2014
08/14
by
SFGTV
tv
eye 44
favorite 0
quote 0
are here to talk about sfmta involvement. and i feel like i live here working there's high tech people around you but aside from the technology advances this offers carl will touch on the ability to make further policy changes i'll underscore that is no small challenges given the operators we have we support you carol >> thank you for that enthusiastically and positive introduction. climber has come a long way i'm going to talk about where the clippers are where we're planning for the next generation and happy to take questions. so very quickly as i think most of you know hopefully from being clipper card yours clipper is in place and allows seamless traffic from the all the major bay area riders we have 1.4 million active cards this is progressing more than $35 million and of note for this group 9 million of the board of directors we support are on muni and about 50 percent of all rides are taken with the clipper card. so we're focused on making sure that the clipper works for the operations today and as well as there's an c
are here to talk about sfmta involvement. and i feel like i live here working there's high tech people around you but aside from the technology advances this offers carl will touch on the ability to make further policy changes i'll underscore that is no small challenges given the operators we have we support you carol >> thank you for that enthusiastically and positive introduction. climber has come a long way i'm going to talk about where the clippers are where we're planning for the...
35
35
Aug 22, 2014
08/14
by
KPIX
tv
eye 35
favorite 0
quote 0
the sfmta board will make the final approval based on today's hearing. >>> remember this? this is interstate 280 in san francisco over the 4th of july weekend during majorette tro fit construction. more construction closures are coming over labor day weekend. northbound interstate 280 will be closed from highway 101 to downtown san francisco. the closure begins next thursday afternoon at 2:00 and will continue until 5:00 tuesday morning, september 2. >>> more developments in the aftermath of that brutal killing of james foley. there are now growing concerns about the threat of isis, the terror group that's claiming responsibility. cbs reporter craig boswell has more on the plans by the obama administration. >> reporter: top u.s. officials say the islamic militants isis poses a terror threat unlike anything they have seen. >> they are an imminent threat to all our interests whether in iraq or anywhere else. >> reporter: armed with plenty of money and a brutal ideology, the group now controls territory in syria and iraq. in mosul, the militants stoned a man to death for adul
the sfmta board will make the final approval based on today's hearing. >>> remember this? this is interstate 280 in san francisco over the 4th of july weekend during majorette tro fit construction. more construction closures are coming over labor day weekend. northbound interstate 280 will be closed from highway 101 to downtown san francisco. the closure begins next thursday afternoon at 2:00 and will continue until 5:00 tuesday morning, september 2. >>> more developments in...
SFGTV: San Francisco Government Television
22
22
Aug 21, 2014
08/14
by
SFGTV
tv
eye 22
favorite 0
quote 0
. >> (clapping) >> thank you for your leadership at sfmta it's teacher that we are having to face an unprecedented number of accidents fatality and serious injures about one hundred a year has been the average we want to curtail that and seriously do something about that we've joined together the supervisors along with our office and the sfmta police department and others to suggest that we can end it we have to that r that goal of vision zero in 200240 to make sure we're serious today is another effort here anothers e.r. by a street has been a tragic we hoped not to have happened but also in you ride along the sunset boulevard you can feel that some individuals that are not going to pay attention will view and use this as a freeway it's not a freeway a major pedestrian and traffic thoroughfare that must be right handed for all the modes of transportation and consider people kwhor walking and riding as well as the speedometer so today, we're here on the establishment of a traffic signal but we know that no traffic signal in and of itself nor stop sign will ever create the level of sa
. >> (clapping) >> thank you for your leadership at sfmta it's teacher that we are having to face an unprecedented number of accidents fatality and serious injures about one hundred a year has been the average we want to curtail that and seriously do something about that we've joined together the supervisors along with our office and the sfmta police department and others to suggest that we can end it we have to that r that goal of vision zero in 200240 to make sure we're serious...
. >> (clapping) >> thank you for your leadership at sfmta it's teacher that we are
SFGTV: San Francisco Government Television
18
18
Aug 18, 2014
08/14
by
SFGTV
tv
eye 18
favorite 0
quote 0
adopting a policy for placement of wireless facilities on sfmta owned and managed real estate assets; approving the master license agreement for placement of pole-mounted wireless facilities on sfmta-owned poles form; authorizing the director to execute master license agreements with wireless telecommunications companies; and waiving section 10 of the sfmta board of directors' rules of order as to notice of this action. >> all right, an accident written presentation in front of us this afternoon. anything to this added? >> i think that i agree that this presentation was, the report was very well written and i think that it is the result of very good staff work to get us to this point, and we have a dynamic market place with a lot of demand for this kind of license and i think that it is a thoughtful process, working with the industry, and with our own infrastructure folks to come to a workable agreement and maybe we will have the staff here to answer any questions. >> yes, howard is the only person who has turned in a speaker card. >> it is wireless, enjoy. thank you. >> all right, me
adopting a policy for placement of wireless facilities on sfmta owned and managed real estate assets; approving the master license agreement for placement of pole-mounted wireless facilities on sfmta-owned poles form; authorizing the director to execute master license agreements with wireless telecommunications companies; and waiving section 10 of the sfmta board of directors' rules of order as to notice of this action. >> all right, an accident written presentation in front of us this...
SFGTV: San Francisco Government Television
12
12
Aug 18, 2014
08/14
by
SFGTV
tv
eye 12
favorite 0
quote 0
. >> thank you for the opportunity to speak, carly pain, sfmta. and excuse me. in developing this pilot program, the city shuttles and the regional shuttles and what we found is that 80 percent of all of the stopping events, on an average day are made by the intracity shuttles, and that includes mission bay, and that includes, others that either by choice, or by planning department requirement, are operating or contracting out their operations for the shuttles, and they tend to be last mile shuttles. and these, for us, one of the great purposes to remind ourselves about the pilot is that we are trying to minimize the impact on muni and the other users and they are agnostic to where the shuttles are going and a shuttle that is stopping in a muni zone and potentially impacting the operations. is having that impact whether it is going to silicon valley or whether it is going two miles. and just somewhere, within san francisco and so, we have made the specific decision not to treat them driftly, and there was a discussion and about at one point whether it was fair o
. >> thank you for the opportunity to speak, carly pain, sfmta. and excuse me. in developing this pilot program, the city shuttles and the regional shuttles and what we found is that 80 percent of all of the stopping events, on an average day are made by the intracity shuttles, and that includes mission bay, and that includes, others that either by choice, or by planning department requirement, are operating or contracting out their operations for the shuttles, and they tend to be last...
SFGTV: San Francisco Government Television
17
17
Aug 18, 2014
08/14
by
SFGTV
tv
eye 17
favorite 0
quote 0
and i was i got hired for those, and the sfmta for october of 2011 and i am glad that it was advice and so that we get equal pay and i appreciate that very much. and as i said in mr. haily that june second, i did work, on my days off for tuesday and wednesday, and that monday, i worked and that tuesday and wednesday i need a day off because i could come in here and hold my head up high and talk to you and have you listen to me if i were to, you know, got sick, and so, here i do appreciate it and i want to think that the way that the out come came is because i presented my numbers to the board. and every saw it and they asked me if we had a firmly and apologized and said that the numbers were correct and we are like a family and we argue. but we are good. you know? and i want to thank you, and thank you very much. and you know it was great. >> two things that i wish to say for one thing the whole problem for the muni drivers could have been prevented if the proposal was from the start and no members of this board or no executive, or anyone in a position of administration would have agree
and i was i got hired for those, and the sfmta for october of 2011 and i am glad that it was advice and so that we get equal pay and i appreciate that very much. and as i said in mr. haily that june second, i did work, on my days off for tuesday and wednesday, and that monday, i worked and that tuesday and wednesday i need a day off because i could come in here and hold my head up high and talk to you and have you listen to me if i were to, you know, got sick, and so, here i do appreciate it...
SFGTV: San Francisco Government Television
23
23
Aug 18, 2014
08/14
by
SFGTV
tv
eye 23
favorite 0
quote 0
and including credit and debit cards and the sfmta parking cards as well as pay by phone and coins, and have the larger display screens which is a concern that we heard a lot from the older meters and importantly if you do pay by phone and it will show up on the meter display, which none of our existing meters did. and there is some technology cal flexibility that will allow us to have the meter service the mum pell purposes such as the part time and general meters pashing at other times and in the course of upgrading we are not making other changes to rates or time limits or anything else that would always be done separately through the action of the board or otherwise. but we are replacing all of the meters in the city, we should be done with that by february of 2015, and the folks that have been out in the neighborhood have seen them already and so we are glad to be able to report on that. and we have got good feedback so far, and but, by february 2015, all new meters in san francisco which is good news. and then, final item of my report. is disclosure of labor agreements. and just t
and including credit and debit cards and the sfmta parking cards as well as pay by phone and coins, and have the larger display screens which is a concern that we heard a lot from the older meters and importantly if you do pay by phone and it will show up on the meter display, which none of our existing meters did. and there is some technology cal flexibility that will allow us to have the meter service the mum pell purposes such as the part time and general meters pashing at other times and in...
SFGTV: San Francisco Government Television
16
16
Aug 16, 2014
08/14
by
SFGTV
tv
eye 16
favorite 0
quote 0
i didn't know that the sfmta reviewed this project and i was told i was begin of everything there was. there are things from the shadow study where -- long story short the planning department never complied with the request and when they were supposed to before the referral to you, the ethics commission, the senator terms i -- the search terms and from that staff and i found out about it last time and there was minimal files on there. what happened jonah for the fourth time for department of technology and decided to ask for the right search terms but only the deleted emails and not everything that i asked for but only the deleted ones and i found that out from the report to you. the planning department has minimally complied with these requests repeatedly and they kept saying you have everything there is. >> what is the volumes of documents you received from them all total? >> the volume of documents? >> yeah, what are we talking about? >> they were all cds. for instance the one i received last time the last file was cut off so i never got anything there. there's only so much room on
i didn't know that the sfmta reviewed this project and i was told i was begin of everything there was. there are things from the shadow study where -- long story short the planning department never complied with the request and when they were supposed to before the referral to you, the ethics commission, the senator terms i -- the search terms and from that staff and i found out about it last time and there was minimal files on there. what happened jonah for the fourth time for department of...